Thursday, October 12, 2017

Well Thoughtout Plans are a Must



     Proper planning works well when it comes to renovation. Since the initial tree disaster we have been working diligently to get things closed up and get the house back into a livable situation. The new base floor is down as well as the wall going up. Today the electrical is going into the wall.  After careful consideration we have decided to only put in a glass panel door going out to the deck and no window as that end of the house gets far too much heat from the sun. I am going with a non-traditional wall covering for the one long wall, tin and one short wall will get a rustic wood wall where a bench and hooks will go. Paint will also be a major change as we are going from grape to cream. We are also updating the ceiling light fixture. Plumbing fixtures will be connected to the bathroom plumbing for the washer and dryer.  The pine board flooring is being finished up and sanded down and re-coated with a lighter stain.  It will be a nice laundry/office space when it is all complete.

No comments:

Post a Comment